by rorofernandez | Aug 5, 2020
Services Renewable · Substation Bandera EC Substation This project consisted of an upgrade to the Bandera Substation for reliability and load support, as mandated by the Texas PUC as part of CREZ (Competitive Renewable Energy Zone) projects. For the project, a...
by rorofernandez | Aug 5, 2020
Services Substation · Renewable Enterprise Substation The Enterprise Substation was designed and constructed to connect a 34.5kV Collector System from the SunEdison owned 80MW Enterprise Solar Project in Iron County, Utah, and provides a path to market for the...
by rorofernandez | Aug 5, 2020
Services Renewable · Structures · Substation Escalante Substation The Escalante 345kV Substation was designed and constructed to interconnect a 34.5 kV collector system from the SunEdison owned Escalante 1, 2, and 3 solar projects in Beaver County, Utah, and provides...
by rorofernandez | Aug 5, 2020
Services Substation East 138kV Substation Transformer Additions This project consisted of installing (1) 138/26.18X13.09kV 46.6MVA power transformer at the existing East substation. The scope also included 138kV and 25kV bus additions, protective relaying, grounding,...
by rorofernandez | Aug 5, 2020
Services Structures · Substation Seward Junction 138kV Substation Due to increasing loads and reliability concerns in the areas north of Austin, Texas, Pedernales Electric Cooperative (PEC) constructed a new substation between Leander and Georgetown. As part of an...