News

News

Bergheim Substation

Client Spotlight: Bergheim Substation in Bergheim, TX

Pedernales Electric Cooperative is experiencing load growth in their service territory west of the Bulverde area, near the Hwy. 46/Blanco Rd. intersection.  With this comes the need for a substation expansion to help serve those PEC members.  M&S Engineering designed the addition of a single breaker bay to the 138 kV bus at Bergheim Substation near Bergheim, Texas.  The new bay includes a 138 kV circuit switcher and a 46 MVA, 138 kV to 25 kV power transformer.  The distribution side of the transformer will include a 25kV total breaker, tie breaker, and four feeder breakers.

Cory Kadlacek, P.E.
Spring Branch, TX
(830) 228-5446

In The News

  • Spring 2022 Newsletter
    Full Newsletter Below...
  • Garland Power and Light in Bryan, TX
  • New M&S Team Members
  • Winter 2022 Newsletter
  • New Team Members for M&S
    M&S Engineering, and its sister company Sherwood Surveying & S.U.E., were founded on values that foster an atmosphere where we focus on long-term relationships built on trust. That trust is formed over time by consistently delivering quality designs and expert advice to our clients. M&S looks forward to seeing continued growth and what the future holds. M&S Engineering is an EOE/Affirmative Action Employer M/F/D/V....
  • CIP Project Design in Bryan, TX
    M&S Engineering is the lead design firm for Bryan Texas Utility’s annual electric distribution capital improvement projects. By performing engineering design, staking, right-of-way acquisition, bill of materials development, and bid document preparation one fiscal year prior to construction, M&S is able to ensure the BTU CIP stays on schedule and within budget. M&S was assigned a wide variety of projects to include re-conductors, improvements to substation exits, 1/0 to 3/0 upgrades, and ampacity verification on underground feeders. All projects were completed and delivered to BTU on time, under budget, and to BTU’s standards....